MicroLink 1.25 MW Pod System, V2
02 Thermal Pod. Facility loop plant
REVISION
A
00.00.00
First issue
B
00.00.00
Coordination
C
00.00.00
Checked
D
08.08.2026
Title block rebuilt, notes moved off the plan, scale to 1:20
E
08.08.2026
CT 001 moved to the east end
DRAWING NO
AE 321
SCALE
1:20 at A1
REV
E · NS
DATE
08.08.2026